Storm Sewer Project

On this particular project we installed a 24" HDPE storm sewer line with a single structure to divert the line into an existing pond. All restorations were completed, including sod repair, sidewalk repair and paving.


Getting ready our safety equipment ready to start the excavation. Trench boxes are typically used on excavations 5'-0" or deeper and also depending on slope availability and soil stability.
We are opening the existing sewer structure to connect a new HDPE pipe.  
  At the end of pipe we have constructed an end wall.
  Side walk restoration in progress.
Asphalt restoration in progress.  
  The sand on top of the new pavement helps it match the existing old pavement for a perfect finished look.
Pavement completed. Sod has been restored.
Completely Restored Jobsite. GA Nichols takes pride in all our projects and its proven by our repeat customers. Reference are available upon request.